Hover each card to see the repair method and a job photo. Every failure mode below has a proven fix that doesn't require shutting down your structure.

Standing water on Level 2. Drain grates rust-locked. Tenants reporting pooling near P-14 column bay.
Full-diameter replacement with schedule-40 PVC or no-hub cast iron. Camera inspection first — we only open what needs opening.

Rusted-out galvanized channel. Grate frames heaving from freeze-thaw. Water bypassing the system entirely.

Saw-cut, remove, and reset polymer-concrete channel with stainless heel-proof grates. Set flush to deck finish grade.

Wet walls at stairwell B. Inspector red-tagged the system. Property cannot pass annual FD test.

Full riser replacement in Schedule 10 black steel. Pressure-tested to 200 PSI per NFPA 14. FD sign-off package included.
Annual backflow test failed. Water authority threatening service interruption to the entire structure.

Remove failed RPBA, install new Watts or Febco assembly, test, and file certification directly with the water authority.
When the complaint call comes in, we do more than snake the line. We camera the whole system and give you a phased repair program so nothing fails twice.
Before we quote a single repair, we run a CCTV inspection of every storm line, sanitary lateral, and roof drain connection in the structure. You get a condition report with footage, prioritized by urgency and budget impact.
Hospitals. Airports. Mixed-use towers. You cannot close Level 3 for a week. We sequence repairs by zone, working around posted clearances and peak-traffic windows. The structure stays open. The repair gets done.
Every crew member is trained on PT slab identification. We core-drill with GPR clearance and coordinate with your structural engineer before any penetration. GCs have used us as their plumbing sub on PT structures for 12 years without a single tendon incident.
See How We Fix ThisEvery project card below is a completed job — structure name, scope, and the numbers that matter. No renderings, no stock photos of smiling contractors.

Chicago, IL — Hospital Parking — 6 Levels
Full storm system repipe, 4 trench drain replacements, backflow certification
Chicago, IL — Airport Parking — 8 Levels
Storm line camera survey, Phase 1 emergency repair, standpipe riser replacement floors 4–8

Chicago, IL — Retail + Residential Parking — 3 Below Grade
PT slab core-drill with GPR, 3 new floor drains, complete sanitary repipe for levels B1–B3

Cicero, IL — Surface + Deck Parking — 2 Levels
Trench drain channel rebuild, 6 catch basin replacements, new storm tie-in to city main
Tell us about your structure — levels, drainage complaints, last inspection date. We'll scope a full assessment and come back with a condition report within 48 hours.