Before — Failed drain
After — Restored
Drag to compare
Get a Structure Assessment
4.2MGallons of water diverted
8,400 LFPipe replaced in active structures
0Post-tensioned tendons cut
12 yrsParking structure specialization
100%FD hydrostatic tests passed first attempt
< 4 hrEmergency response to occupied structures
47Completed parking structure projects
4.2MGallons of water diverted
8,400 LFPipe replaced in active structures
0Post-tensioned tendons cut
12 yrsParking structure specialization
100%FD hydrostatic tests passed first attempt
< 4 hrEmergency response to occupied structures
47Completed parking structure projects
Common Failure Scenarios

You've seen this before.
So have we.

Hover each card to see the repair method and a job photo. Every failure mode below has a proven fix that doesn't require shutting down your structure.

Before repair: Corroded Cast-Iron Storm Lines in parking structure
01 — Storm Drainage
Hover for fix →

Corroded Cast-Iron Storm Lines

Standing water on Level 2. Drain grates rust-locked. Tenants reporting pooling near P-14 column bay.

After repair: Storm Line Replacement completed in parking structure
The Fix

Storm Line Replacement

Full-diameter replacement with schedule-40 PVC or no-hub cast iron. Camera inspection first — we only open what needs opening.

340 ft replaced, zero deck closuresSee How We Fix This
Before repair: Failed Trench Drain Channels in parking structure
02 — Trench Drains
Hover for fix →

Failed Trench Drain Channels

Rusted-out galvanized channel. Grate frames heaving from freeze-thaw. Water bypassing the system entirely.

After repair: Trench Drain Rebuild completed in parking structure
The Fix

Trench Drain Rebuild

Saw-cut, remove, and reset polymer-concrete channel with stainless heel-proof grates. Set flush to deck finish grade.

180 LF new channel, flush-set flush to deckSee How We Fix This
Before repair: Leaking Fire Standpipe Risers in parking structure
03 — Fire Standpipes
Hover for fix →

Leaking Fire Standpipe Risers

Wet walls at stairwell B. Inspector red-tagged the system. Property cannot pass annual FD test.

After repair: Standpipe Repipe completed in parking structure
The Fix

Standpipe Repipe

Full riser replacement in Schedule 10 black steel. Pressure-tested to 200 PSI per NFPA 14. FD sign-off package included.

Passed FD hydrostatic test first attemptSee How We Fix This
Before repair: Failed Backflow Preventers in parking structure
04 — Backflow Prevention
Hover for fix →

Failed Backflow Preventers

Annual backflow test failed. Water authority threatening service interruption to the entire structure.

After repair: Backflow Assembly Replacement completed in parking structure
The Fix

Backflow Assembly Replacement

Remove failed RPBA, install new Watts or Febco assembly, test, and file certification directly with the water authority.

Certified same-day, service restoredSee How We Fix This
Full-Structure Programs

One complaint becomes
a complete system audit.

When the complaint call comes in, we do more than snake the line. We camera the whole system and give you a phased repair program so nothing fails twice.

Starting Point

Full-Structure Camera Inspection

Before we quote a single repair, we run a CCTV inspection of every storm line, sanitary lateral, and roof drain connection in the structure. You get a condition report with footage, prioritized by urgency and budget impact.

100%
of lines documented
48 hr
report turnaround
3 tier
priority ranking
See How We Fix This
No Shutdown Required

Phased Repair Programs

Hospitals. Airports. Mixed-use towers. You cannot close Level 3 for a week. We sequence repairs by zone, working around posted clearances and peak-traffic windows. The structure stays open. The repair gets done.

Phase 1Emergency stabilization & isolation
Phase 2Zone-by-zone line replacement
Phase 3Final testing & documentation package
Post-Tensioned Slab Expertise

We Don't Cut Tendons.

Every crew member is trained on PT slab identification. We core-drill with GPR clearance and coordinate with your structural engineer before any penetration. GCs have used us as their plumbing sub on PT structures for 12 years without a single tendon incident.

See How We Fix This
Completed Work

The walkthrough is dry.
Real structures. Real numbers.

Every project card below is a completed job — structure name, scope, and the numbers that matter. No renderings, no stock photos of smiling contractors.

Completed parking structure plumbing project: Eastgate Medical Center, Chicago, IL
Hospital / No Shutdown

Eastgate Medical Center

Chicago, ILHospital Parking — 6 Levels

Full storm system repipe, 4 trench drain replacements, backflow certification

220K
Gallons diverted
680 LF
Linear ft of pipe
112 hrs
Hours to complete
See How We Fix This
Completed parking structure plumbing project: Terminal C Parking — O'Hare, Chicago, IL
Airport / Active Structure

Terminal C Parking — O'Hare

Chicago, ILAirport Parking — 8 Levels

Storm line camera survey, Phase 1 emergency repair, standpipe riser replacement floors 4–8

420K SF
Sq ft of deck
1,200 LF
Pipe replaced
> 3 hrs
Zero lane closures
See How We Fix This
Completed parking structure plumbing project: River North Mixed-Use Tower, Chicago, IL
PT Slab / Below Grade

River North Mixed-Use Tower

Chicago, ILRetail + Residential Parking — 3 Below Grade

PT slab core-drill with GPR, 3 new floor drains, complete sanitary repipe for levels B1–B3

0 cut
PT tendons avoided
14 units
New floor drains
3 wks
Weeks scheduled
See How We Fix This
Completed parking structure plumbing project: Midway Commerce Park, Cicero, IL
Commercial / Deck Drainage

Midway Commerce Park

Cicero, ILSurface + Deck Parking — 2 Levels

Trench drain channel rebuild, 6 catch basin replacements, new storm tie-in to city main

340 LF
Trench drain LF
6 rebuilt
Catch basins
18 days
Completion time
See How We Fix This
Drain
Ready to schedule?

The leak is handled
before anyone parks.

Tell us about your structure — levels, drainage complaints, last inspection date. We'll scope a full assessment and come back with a condition report within 48 hours.

48-hour report turnaround
Camera footage + written condition summary
No-shutdown methodology
All work sequenced around your operations
Licensed in IL, IN, WI
Bonded & insured for commercial structures
Get a Structure Assessment

No form. Direct to our estimating team.

Drain — Parking structure plumbing specialists. 48-hr assessment turnaround.
Get a Structure Assessment